Pleas answer 13567891013 3 What is included in the establish

Pleas answer 1,3,5,6,7,8,9,10&13
3. What is included in the establishment of a \"functional\" baseline? \"allocated\" baseline? \"product\" baseline? Why is baseline management important? 4. Select a system of your choice, and construct a sequential flow diagram of the overall system development process Identify the major tasks in system development, and dvelop a plan/schedule of formal design reviews Briefly describe what is covered in each 5. Identify some of the benefits derived through formal design review. Describe some of the concerns. 6. In developing an agenda in preparing for a formal design review, what considerations must be addressed in the selection of items to be covered in the review process? How are review and evaluation criteria identified? Describe the steps and resources required in preparing for the design review 7. How are technical performance measures (TPMs) considered in the design review process? 8. In the event that a deficiency is 3 mins left in chapter 50%

Solution

1)In viewing the overall design process the necessary checks and balances must be incorporated to ensure that the system configuration being developed will indeed fulfil the initially specified requirements.These checks and balances accomplished through the conductance of design reviews are provided early in the system life cycle when changes can be accomplished with relative ease and usually without great cost.

2)The result of QFD analysis indicating areas of importance in design can lead to the preparation of design related questions which when apllied can help to emphasize the nature of the criteria that should be reflected in the ultimate design,configuration being reviewed.By asking the right questions ,one can provide the proper emphasis where required.

3)Functional baseline:Initial specifications established ,contract etc.

Allocated baseline:State of work products after requirement are approved.

Product baseline:Contains the releasable contents of the project.

A baseline is essential for managing project change as the whole scope of what is being developed as well as schedule and cost for project completion can be measured and used as a benchmark to evaluate change requests.

5)It is recognized that some of the requirements may not be adequately defined during the conceptual design phase and the review of such may have to be accomplished later.However,in promoting desired generic approach described herein maximum effort should be made to complete the requirement early,even though changes may be necessary as asystem design process .The object is to encourage early system definition even if the baseline changes later.